Saturday, June 23, 2007
Since i havent talked bout my uni works for quite a while, now im gonna post some pics of my projects. It has been 4 tough months in Perth because i had 2 part time jobs and at the same time had to keep up with my uni works. It wasnt easy!

The process of building the model of Perth Concert Hall (an existing building in Perth)

Final model. I used 1 week to finish the whole model and that 1 whole week was tough. I only had an average of 3-4 hours of sleep a day.
Photos below are my design for my final project. The project was about designing a house and a working place for a famous artist, Damien Hirst. This project wasnt easy and it took me almost 1 month to finish it. I had less than 10hours of sleep during the last week of the project. We had to do a folio with all the detail drawings of our design.
The Perspective drawing, Section and Plan

The interior of my structure
All of them were hand-drawn by me myself. Imagine how much effort i put in it.

The sketch model and the final model of my project. I didnt sleep for 2 straight days just to finish the model.
$BlogItemBody$>